Pylons
Click on pictures to enlarge, click again for full screen
Pylon components painted & ready for assembly
Assembled & ready for installation
75 Gallon gas tanks
Mounting bracket at top & gas cap at bottom
Building 75 gallon gas tank
Checking alignment
Checking pylon mounting with 75 gallon gas tank
Another view
Mock up side view
Mock up complete & tank is ready for paint & assembly
Two 75 gallon gas tanks
Side view show two drain points
Pylon glued to wing.
Front view of right wing pylon .
Front view of left wing pylon .
Right tank mounted in place
Left tank mounted in place
A view of both tanks
500 pound bombs
Two bombs as received
Ready to glue holding assembly
Tail fins have been glued in place
Side view
Taped for paint
Yellow noses
Left wing bomb.
Two half's fit together
Check for alignment & fit
Checking for alignment
Ready for primer & paint
Both bombs will have nose painted yellow
Ready for installation
Right wing bomb
Paint & Decals is next section
Copyright © 2005-2022 Walt Carnes, All rights reserved.
E-mail me at:
walt.carnes@aol dot com
According to The Weather Channel Control Tower, the weather conditions at the Hanger are: